Kithara Lounge

22 Days Record

Our mission was successfully accomplished within 22 days.

The schedule was extremely tight to deliver a developed design drawings plus the installation of huge chandelier weighing 1.5 tons without its steel structure, including 1477 Crystals in various tones, in addition to the venue’s renovation work starting from MEP & steel structure design and coordination with the new interior, to the final walls, ceiling and floor finishes.

The concept design has been done by a third party, while our scope of work was design development & implementation.